Expand or upgrade your plant to supersize your capacity
within a small footprint!

Activated Sludge Extended Air process is designed for 12 to 24 hours hydraulic retention time (HRT). The MBBR needs only 2 to 3 hours HRT to achieve the same level of nitrification due to higher concentration of mature bio mass. Shorter HRT significantly reduces tank volume for processing.

Typical biomass levels in activated sludge plants are between 2500 mg/l to 3500 mg/l of suspended solids. Typical equivalent biomass in an MBBR is more than 6000 mg/l of attached growth. Increased mass allows for the use of a smaller reactor.

Satellite Image
With the HIT System retrofit above, two retrofited clarifier reactors (A) can treat as much as five reactors of a traditional AS system (B). This treatment includes the addition of denitrification.



FOR MORE INFORMATION CONTACT US
713 647-6667 or hw@headworksusa.com
Treat up to TEN TIMES your design capacity
A 41 meter diameter HIT System treatment tank (shown below) can efficiently treat as much wastewater as 10 AS reactors (pictured left), including the addition of denitrification. HIT System treatment tank

HIT System process diagram
View the diagram

Interchangable reactor system simplifies the process design and setup
View the diagram